Phase Case Study Partition & Door Replacement

The Corridor Renovation

Managing non-structural partition demolition and new glass door installation through structured phase states and graphic overrides.

2026-11-05 • PhaseState Team • 6 min read
3 Schematic Plans Phase Matrix Mapping Educational Reference
The Corridor Renovation
Phased architectural cutaway of corridor partition and door replacement Phase Matrix Analysis

Public circulation spaces require meticulous phased planning whenever layout adjustments intersect with ongoing facility operations. In this corridor renovation, Partition A and Door A are scheduled for complete removal, allowing the installation of high-performance Partition B and Door B to broaden transit capacity and modernize egress access.

Maintaining documentation integrity throughout this transition relies on clear phase parameter management rather than separate detached model files. By linking elements directly to model phases and assigning graphic overrides, the documentation team delivers three synchronized schematic plans that keep demolition boundaries and new assemblies perfectly aligned across all drawing sets.


01 Baseline Documentation of Existing Partition A and Door A

Documenting existing building fabric accurately establishes the foundation for any successful alteration project. Partition A and Door A are assigned to the Existing phase at initial model creation, with their Phase Demolished property left unset. Under this setting, standard existing plans render both items with continuous lines and neutral material patterns.

When the scope of work requires reconfiguration, modifying the Phase Demolished parameter to Renovation Phase prompts the software to alter their visual state dynamically. Rather than deleting components or duplicating geometries on separate CAD layers, the phased model retains both items while classifying them strictly as elements marked for physical extraction.

Scope & Regulatory Note

This case study serves purely as an educational demonstration of BIM graphic states and phase matrices. It does not constitute actual construction drawings, fire protection plans, or life safety egress approval.


02 Graphic Overrides and Demolition Phase Visualization

Isolating removal operations requires customized phase filters such as Show Previous + Demo. Applying this filter displays retained structures in faint halftone tones while Partition A and Door A display heavy dashed contours and bold hatch overrides, ensuring demolition contractors instantly discern boundaries on site.

Structured phasing prevents field confusion by ensuring that every demolished partition clearly displays its fate before new construction begins.

— PhaseState Technical Editorial

Because Door A is hosted directly by Partition A, removing the partition removes both the host and the door insert concurrently in subsequent phase views. This programmatic link guarantees that no floating doorway frames or orphan openings linger once the main corridor partition is marked for complete demolition.


03 Modeling New Construction: Partition B and Door B Delivery

Once demolition boundaries are verified, the design team introduces Partition B and Door B directly within the New Construction phase view. The model handles these elements with crisp primary line weights and distinct wall fill hatching, completing the transformation through three precise documentation steps:

  • Partition B is modeled with Phase Created set to New Construction, establishing an updated circulation envelope without referencing demolished Partition A.
  • Door B is inserted into Partition B with its Phase Created parameter matching the host wall, ensuring seamless coordination in material schedules.
  • Three coordinated schematic plans (Existing Conditions, Demolition Scope, and Proposed Layout) are generated from the single unified model to prevent dimensional discrepancies.

This systematic workflow prevents double-counting in cost estimates by cleanly separating material quantities between components designated for removal and items specified for new installation.


Documentation Desk

PhaseState Team

Architectural Documentation Specialists

The PhaseState Team provides practical research, technical documentation standards, and phasing methodology guides for architects and BIM coordinators working on complex renovations.

04 Common Phasing & Coordination Questions

Technical Phasing Support

Have Questions About Phased Architectural Documentation?

Reach out to our technical desk via WhatsApp to discuss graphic override setups, phasing filters, and model coordination strategies.